Hazardous Waste Generated by Construction and
HTTPS
2012 5 29 shingles generated from the construction, renovation, and demolition of buildings, roads, bridges, and dams. Total C&D waste was estimated to be 325 million tons in 2003. C&D debris is not federally regulated, except to the extent that solid waste landfills must fol low a few basic standards outlined in the Federal Register at 40 CFR Part 257
Construction Waste Hazards
HTTPS
2021 8 16 Sep 18, 2018 Under the Waste Framework Directive, construction and demolition waste is a priority waste stream. It sets the following objectives by 2020, the preparing for re use, recycling and other material recovery of non hazardous construction and demolition waste excluding naturally occurring material defined in category 17 05 04 in the